CASE STUDIES

PAVEPAWS REPAIR AND RETROFIT PROJECT

U. S. COAST GUARD

RESCUE 21 PROJECT

U. S. COAST GUARD NATIONWIDE HOUSING STUDY AND ASSESSMENT PROJECT

Sustainable Group key personnel performed on-site construction services to construct, operate, and maintain water treatment systems for highly toxic mine tailings.

Sustainable Group key personnel performed design review and construction management services for multiple U.S. Coast Guard Rescue 21 communication sites along the eastern seaboard of the United States.

Sustainable Group key personnel performed on-site facility assessments of hundreds of U. S. Coast Guard Housing Units in California, New York, New Jersey, and Puerto Rico. Current housing maintenance practices were also evaluated, compared to industry standards, and actionable recommendations for improvements were made.

U. S. COAST GUARD NOYO RIVER LIGHT REPAIRS PROJECT

Sustainable Group key personnel performed on-site construction services to replace the damaged submarine cable supplying power to the critical Noyo River Directional Light in Noyo, California.

U. S. COAST GUARD ALAMEDA SANITARY SEWER INSPECTION PROJECT

Sustainable Group key personnel performed on-site construction services to survey and inspect the entire sanitary sewer system on board U.S. Coast Guard Base Alameda.

U. S. COAST GUARD CAMSPAC WATER INTRUSION REPAIR PROJECT

Sustainable Group key personnel performed on-site construction services to repair water intrusion problems at the remote Communication Area Master Station Pacific in Inverness, California.

U. S. COAST GUARD AIR STATION SACRAMENTO C-27 BEDDOWN CONSTRUCTION

U. S. COAST GUARD TRAINING CENTER PETALUMA BIRD DETERRENT INSTALLATION

U. S. COAST GUARD TRAINING CENTER PETALUMA SAFR STORMWATER RUNOFF SYSTEM CONSTRUCTION

Sustainable Group key personnel performed the on-site construction services required to base the new C-27 air frame at Air Station Sacramento.

Sustainable Group key personnel performed on-site construction services to install effective deterrent systems to prevent Cliff and Barn Swallows from constructing mud nests on the exterior of the Bauer Building #544 at Training Center Petaluma.

Sustainable Group key personnel performed the design and on-site construction services required to control and treat lead contaminated stormwater that leaves the Small Arms Firing Range (SAFR) at Training Center Petaluma.

U. S. DOT MARITIME ADMINISTRATION SUISUN BAY RESERVE FLEET STORMWATER PROJECT

Sustainable Group key personnel along with Joint Venture Partner Terraphase Engineering provide professional stormwater management and environmental support services for the Suisun Bay Reserve Fleet (SBRF).

PG&E STORMWATER POLLUTION PREVENTION PLAN EXECUTION AND BEST MANAGEMENT PRACTICES

Sustainable Group key personnel executed Storm Water Pollution Prevention Plans and installed Best Management Practices at multiple sites for PG&E through a Master Services Agreement with PG&E. Total Contract Value to date $3,000,000.00.

U. S. COAST GUARD TRAINING CENTER PETALUMA SAFR  SURFACE DANGER ZONE REDUCTION PROJECT

Sustainable Group key personnel performed the design and on-site construction services required to enhance safety and reduce the Surface Danger Zone (SDZ) at TRACEN Petaluma.

U. S. COAST GUARD AIR STATION SACRAMENTO REPAVING PROJECT

U. S. COAST GUARD BASE CASREP UNDERGROUND GAS LINE REPLACEMENT

U. S. COAST GUARD NOVATO HOUSING AREA ELECTRICAL SYSTEM REPLACEMENT

Sustainable Group key personnel performed construction management services for repaving activities throughout the active Air Station.

Sustainable Group key personnel performed on-site construction services to replace a 4 inch underground gas line and restore critical gas service to Building 50.

Sustainable Group key personnel performed on-site construction services to replace major components of the Novato Housing Area Electrical Distribution System.

U. S. COAST GUARD POINT SAN PABLO VTS EQUIPMENT SHELTER REPLACEMENT

Sustainable Group key personnel performed on-site construction services to replace the equipment shelter, install a new emergency generator, and complete other needed repairs at the remote Point San Pablo VTS location.

PG&E WEST GATES SOLAR SITE DEVELOPMENT AND CONSTRUCTION SERVICES

Sustainable Group key personnel performed on-site construction services to complete site preparation and road construction for the West Gates Solar Station 10 MW Photovoltaic Plant. Total Contract Value $639,000.00.

REHABILITATION OF U. S. FOREST SERVICE DIXIE MOUNTAIN LOOKOUT

Sustainable Group key personnel performed on-site construction services to rehabilitate the historic Dixie Mountain Fire Lookout, originally built in 1928.

BART SAN BRUNO STATION ACCESS, PATH, AND WAYFINDING IMPROVEMENT

BART HAYWARD SANDOVAL WAY ACCESS ROAD CONSTRUCTION

ALAMEDA COUNTY LANDSLIDE REPAIR PROJECT

Sustainable Group key personnel performed on-site construction services to construct several access, path, and wayfinding improvements at the San Bruno Station.

Sustainable Group key personnel performed on-site construction services to construct the new Sandoval Way Access Road as part of the BART Hayward Maintenance Complex Project.

Sustainable Group key personnel performed on-site construction services to repair a landslide below the county juvenile hall in San Leandro, CA.

U. S. COAST GUARD BASE ALAMEDA SANTIARY SEWER SYSTEM REPAIR

Sustainable Group key personnel performed on-site construction services to repair the sanitary sewer system on board U.S. Coast Guard Base Alameda.

PORT OF OAKLAND ENVIRONMENTAL TESTING ASSISTANCE

Sustainable Group key personnel performed on-site construction services to assist with the environmental testing at the Port of Oakland.

SIERRA PACIFIC UNDERGROUND STORAGE TANK REMOVAL

Sustainable Group key personnel performed on-site construction management and Quality Assurance oversite during the removal of an Underground Storage Tank (UST).

Copyright © 2009 - 2017. All rights reserved.